Indian Oil Tenders For Setting Up 350 KWp Solar Power Project In Haryana

Feed News

Indian Oil Corporation Ltd (IOCL) recently floated a tender installation  of 350 KWp, On-Grid,  Ground (300Kwp) & Roof Mounted (50KWp) Captive Solar Power Project.

The location of this project is at Indian Oil LPG Bottling Plant, Gurugram in Haryana. Last date of bid submission is 17.08.2020 and the opening date of the technical bid is 18.08.2020.

Scope of work for successful bidders include engineering, procurement, construction (EPC) inclusive-of 1-Year Comprehensive Operation & Maintenance (O&M) along with  further Comprehensive O&M for 4 Years.